routeID: 337
Route Title | Century South Loop (2025) |
---|---|
Start Location | Orinda BART NW corner of parking lot, Contra Costa County |
Mileage | 54 |
Terrain Rating | 4 |
Series | Century Prep |
Description | A loop from Orinda Bart following much of the south loop from the 2025 century plus a portion of the route up Pinehurst to Skyline. |
Submitted by | Corwin Zechar |
External Links | * RideWithGPS |